4 tracked data centers from 3 operators, 4 MW of disclosed power across 1 sites. Each row links to a source-verified profile.
| Facility | Operator | Status | Power |
|---|---|---|---|
| American Tower Edge Data Center | — | proposed | 4 MW |
| Level(3) Raleigh | Lumen Technologies Inc | operating | — |
| TierPoint Raleigh | TierPoint, LLC | operating | — |
| American Tower RA1 | American Tower | operating | — |